This is a 76 foot in progress. Watch for the continuing photos of construction. Motors and Generators are set. We are building the interior, the the bridge and the teak transom and accents. The hull is painted and we are working on the cabin & fly-bridge. Check out the teak bulkhead and mezzanine. The teak bulkhead is almost complete, there are also photos of the fly-bridge. Click on the photo to enlarge. 76' in Production
Getting ready for launch
Pictures of the 19' Custom Shallow Water Tender and 12' Nouvarania Tender
Installation and History of the Building Process Flipping the Hull Right side up after Applying Fiberglass, Barrier Coats and Fairing Compound We just flipped the hull from right-side up to up-side down in order to glass the hull. Juniper Planking and Okoume Plywood with Fiberglass Matting Framing
|
|
|